• IA-05
  • Industrial Automation · course 5 of 5
  • Graded practical

Motor Control, VFDs and Commissioning

Three weeks on the part of the job that happens on site: starters, drives, interlocks, loop checks, FAT, SAT and the first start-up.

weeks
3
live classes
6
graded practical
1
start any time
On demand
Outcomes

What you'll learn

  • Select a starter or drive for a motor and justify it
  • Set up a VFD: parameters, ramps, protection, control from the PLC
  • Design interlocks that protect people and machines without nuisance trips
  • Run loop checks and I/O checks against a checklist
  • Run a FAT and a SAT and write them up
  • Bring a line from cold start to rated speed and hand it over
Motor control panel with breakers and contactors, a variable frequency drive wired to a three-phase motor, and a laptop running the commissioning software
Course data sheet
Code
IA-05
Track
Industrial Automation, weeks 16–18
Level
Advanced
Prerequisite
PLC Programming, or equivalent experience
Starts
On demand · begin the week you enrol
Live classes
Tue and Thu 19:00–21:00 WAT, 6 sessions
Clinic
Sat 10:00–12:00, 3 sessions
Assessment
1 graded practical, 2 quizzes
You need
A laptop, Chrome, about six hours a week
Why commissioning

Anyone can program on a desk. Commissioning is where engineers are made, and where plants pay the most.

Every project ends with someone on site at midnight with a laptop, a checklist and a line that will not start. Commissioning engineers are the best paid people in automation because they can do everything: motors, drives, wiring, logic, networks and the paperwork that proves it is safe to run. Most graduates have never done a loop check.

This course is three weeks of doing exactly that. You select starters and drives, set up a VFD from the PLC, build the interlocks, run loop checks, FAT and SAT on a packaging line in the MAT Lab, and bring it from cold start to rated speed with the faults a real start-up throws at you. An automation engineer who has commissioned plants grades the whole record.

Hands-on
11 hours in the lab over three weeks
Graded by
An automation engineer who has commissioned live lines
You keep
A complete commissioning record on your portfolio
Counts toward
The Industrial Automation track
Syllabus

Six sessions, three weeks

  • 12-min pre-class video
  • Live class
  • Quiz
S1Motors, starters and protection

DOL, star-delta, soft starters; overloads, contactors, MCC layout; reading a motor nameplate.

S2Variable frequency drives

How a VFD works, parameters that matter, ramps, braking, protection, control from the PLC over hardwired and network.

S3Interlocks and safety

Guard doors, e-stops, safety relays and safety PLCs; designing interlocks that do not trip for nothing.

S4Loop checks and I/O checks

Point-to-point testing, the checklist, the punch list; what "done" means.

S5FAT, SAT and start-up

Factory and site acceptance tests, start-up sequence, tuning drives on the line, handover documents.

S6Start-up clinic and practical review Practical due

Your line brought to rated speed live, with injected faults; practical submission due.

LINE 3 · START-UP · M-301 VFDRAMPING · 1180 RPM
Loop checks
96 / 96
Punch items
2 open
Time to rate
14 min
Graded practical

Commission the line from cold start to steady state.

In the MAT Lab you take a wired-but-never-run packaging line: set up the drives, build the interlocks, run every loop check, hold the FAT and SAT, then bring the line from cold start to rated speed while we inject the faults a real start-up throws at you. Your instructor grades the commissioning record end to end; it goes on your portfolio.

How the practical runs

From a wired cabinet to a running line, in five steps

You are given a line that has been installed but never run, a set of drawings and a rubric. Then you do what the commissioning contractor is paid for.

  1. 1

    Walk the line

    Check the design against the installation; raise the first punch list.

  2. 2

    Set up the drives

    Motor data, ramps, protection and PLC control on every VFD.

  3. 3

    Loop check everything

    96 I/O points against the checklist; sign each one off.

  4. 4

    FAT and SAT

    Run the acceptance tests, record the results, close the punch list.

  5. 5

    Start it up

    Cold start to rated speed with faults injected; handover pack defended at the Saturday clinic.

Who this course is for

Engineers and technicians who are tired of guessing

Automation engineers about to do their first site commissioning. Electricians and technicians who already work on MCCs and want the controls side. Project engineers who sign off commissioning and want to understand what they are signing.

What you walk away with

Skills you can use on Monday, and proof you have them

The skills to commission a line safely and the paperwork to prove it. A full commissioning record on your public portfolio. A certificate of completion with a verification code. Completion of the Industrial Automation track if you have done the other four courses.

Automation engineer in a hard hat working at a PLC rack in a field control cabinet, laptop open on the ladder logic
Your instructor

A practising automation engineer who programs PLCs for a living

Lead instructor · Industrial Automation track

8+ years on live plants · currently in industry · grades every practical personally

This course is taught by the Industrial Automation lead for your cohort, a practising engineer who does this work on real plants and grades every practical personally. Faculty rotates by cohort, so you meet your instructor on the orientation call.

Track

Course 5 of 5 in Industrial Automation

Courses in the Industrial Automation track
CodeCourseWeeksPriceLink
IA-01 PLC Fundamentals Weeks 5–7 ₦150,000 View PLC Fundamentals
IA-02 PLC Programming: Ladder, ST and FBD Weeks 8–10 ₦150,000 View PLC Programming: Ladder, ST and FBD
IA-03 HMI and SCADA Design Weeks 11–13 ₦150,000 View HMI and SCADA Design
IA-04 Industrial Networks Weeks 14–15 ₦150,000 View Industrial Networks
IA-05 Motor Control, VFDs and Commissioning Weeks 16–18 ₦150,000 This course

Take all five and you've completed the track. Already done three? Upgrade to the full track (₦700,000) for the difference.

See the full track
FAQ

Questions

Is there any on-site work?

All practicals run in the MAT Lab, which models the cabinet, drives and line. Companies that sponsor students can arrange site time separately.

Which drive brands?

Parameters are taught generically with two common brands as worked examples, confirmed at enrolment.

Does this count toward the track?

Yes. It is course 5 of 5 in Industrial Automation. Finish three courses and you can upgrade to the full track for the difference.

What do I get at the end?

A certificate of completion with a verification code, and your graded practical on your public portfolio.

Motor Control, VFDs and Commissioning · on demand

₦150,000 · three weeks · one graded practical

Enrol

Cohort 1 starts 15 January 2027

75 places across three tracks. Applications close when the cohort fills.